Menu Loading...

Buy Quality Insulating Concrete Forms
 from our Value Added Distributors
 or Direct from the Manufacturer

 
FASTFOOT®  by
INSTALLATION - Edging
<back

  1. Drive stakes into ground at the outside edge of slab or wide footing;
     
  2. Attach a 2x4s to the stakes with screws or nails;
     
  3. Install a second 2x4 if the fabric height is greater than 10";
     
  4. Staple Fastfoot® to lumber with hammer tacker, nail other edge to ground;
     
  5. Pour concrete.

     
 

Click here to download the Installation Guide (full footing and edging) (PDF)

 

Home : Why ICFs? : Why BuildBlock? : Products : Pricing : Technical : Support : News & Events : Projects : Contact Us

Phone: 405-840-3386   |   Toll-Free: 1-866-222-2575   |   Fax: 831-597-0792