INSTALLATION - Full Footing
<back

  1. Drive pairs of wood or steel stakes in the ground every 6' to 10' spaced the footing width apart.
     
  2. Using a laser or builder's level, nail (or screw) the 2x4s to the inside of the stakes at the height of the desired footing.
     
  3. Unroll Fastfoot® between the 2x4s, and staple in the correct position using the colored adjustment lines and a hammer tacker with 3/8" staples.
     
  4. Place concrete.