 |
| |
|
FASTFOOT®
by |
 |
|
INSTALLATION - Full Footing |
|
|
<back |
-
Drive
pairs of wood or steel stakes in the ground every 6' to 10'
spaced the footing width apart.
- Using a laser or builder's level, nail (or
screw) the 2x4s to the inside of the stakes at the height of the
desired footing.
- Unroll Fastfoot® between the 2x4s, and staple
in the correct position using the colored adjustment lines and a
hammer tacker with 3/8" staples.
- Place concrete.
|
Detailed Installation
Click here to download the
Fastfoot®
Installation Manual (PDF).
Click here for the
Fastfoot® Installation Video.
Click here to view the
Fastfoot® PowerPoint presentation.
|
|
 |
|
 |
 |
|
Products |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
• |
|
|
| |
|
|
|
|
| |
| Related Links: |
|
|
|